X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0064071216000"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0064071216000
 
| Well ID: 0064071216000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 49.46201, -110.817452 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 49.462010, -110.817452 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/16-12-006-07W4/0
 
| Location: 00/16-12-006-07W4/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/16-12-006-07 W4/00
 
| Location Alias 2: 00/16-12-006-07 W4/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 006
 +
|-
 +
| Meridian: 4
 +
|-
 +
| Range: 07
 +
|-
 +
| Section: 12
 
|-
 
|-
 
| County/Municipality: [[County of Forty Mile No. 8,_Alberta|County of Forty Mile No. 8]]
 
| County/Municipality: [[County of Forty Mile No. 8,_Alberta|County of Forty Mile No. 8]]
Line 17: Line 27:
 
| Well Name: CARDINAL ETZIKOM 16-12-6-7
 
| Well Name: CARDINAL ETZIKOM 16-12-6-7
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Cardinal Energy Ltd.]]
 
|-
 
|-
 
| License Number: 0090788
 
| License Number: 0090788
Line 29: Line 39:
 
| Final Drill Date: 1981-07-24
 
| Final Drill Date: 1981-07-24
 
|-
 
|-
| Well Total Depth: 1055 m
+
| Well Total Depth: 1055.00 m
 
|-
 
|-
| Surface Hole Latitude: 49.46201
+
| Surface Hole Latitude: 49.462010
 
|-
 
|-
 
| Surface Hole Longitude: -110.817452
 
| Surface Hole Longitude: -110.817452
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1981-06-18
 +
| Obtained License
 +
|-
 +
| 1981-07-24
 +
| Drill Stem Test Performed
 +
|-
 +
| 1981-07-24
 +
| Finished Drilling
 +
|-
 +
| 1981-07-25
 +
| Drill Stem Test Performed
 +
|-
 +
| 1981-07-26
 +
| Production Casing Operation Performed
 +
|-
 +
| 1981-07-31
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1981-08-01
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1981-08-02
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1981-08-03
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1989-07-01
 +
| Well Fluid changed to Gas
 +
|-
 +
| 1989-07-01
 +
| Well Mode changed to Testing
 +
|-
 +
| 1999-11-03
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1999-11-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1999-11-04
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1999-11-07
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2003-05-16
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2003-05-16
 +
| Plug Back Performed
 +
|-
 +
| 2003-05-16
 +
| Well Log Performed
 +
|-
 +
| 2003-05-16
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2003-05-18
 +
| Well Log Performed
 +
|-
 +
| 2003-05-20
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 2003-05-20
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 2003-05-20
 +
| Plug Back Performed
 +
|-
 +
| 2003-05-21
 +
| Well Log Performed
 +
|-
 +
| 2003-06-29
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 2003-06-29
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2003-06-29
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2003-07-08
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 183:
 
| 1981-07-31
 
| 1981-07-31
 
| Perforation
 
| Perforation
| style="text-align: right;" | 1025.4
+
| style="text-align: right;" | 1025.40
| style="text-align: right;" | 1025.7
+
| style="text-align: right;" | 1025.70
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 +
|-
 +
| 1999-11-07
 +
| Perforation
 +
| style="text-align: right;" | 750.00
 +
| style="text-align: right;" | 751.00
 +
| style="text-align: right;" | 20
 +
|-
 +
| 2003-05-16
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 732.00
 +
| style="text-align: right;" | 740.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2003-05-20
 +
| Perforation
 +
| style="text-align: right;" | 601.50
 +
| style="text-align: right;" | 602.50
 +
| style="text-align: right;" | 17
 +
|-
 +
| 2003-05-20
 +
| Cement Squeeze
 +
| style="text-align: right;" | 601.50
 +
| style="text-align: right;" | 602.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2003-06-29
 +
| Hydra Jet Perforation
 +
| style="text-align: right;" | 269.50
 +
| style="text-align: right;" | 270.00
 +
| style="text-align: right;" | 1
 +
|-
 +
| 2003-06-29
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 269.50
 +
| style="text-align: right;" | 270.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2003-06-29
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 258.00
 +
| style="text-align: right;" | 267.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1981-08-01
 
| 1981-08-01
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 1025.4
+
| style="text-align: right;" | 1025.40
| style="text-align: right;" | 1025.7
+
| style="text-align: right;" | 1025.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1981-08-02
 
| 1981-08-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 749.8
+
| style="text-align: right;" | 749.80
| style="text-align: right;" | 750
+
| style="text-align: right;" | 750.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1981-08-02
 
| 1981-08-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 754
+
| style="text-align: right;" | 754.00
| style="text-align: right;" | 755
+
| style="text-align: right;" | 755.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 1981-08-02
 
| 1981-08-02
 
| Perforation
 
| Perforation
| style="text-align: right;" | 745
+
| style="text-align: right;" | 745.00
| style="text-align: right;" | 746
+
| style="text-align: right;" | 746.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 1999-11-03
 
| 1999-11-03
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 1008
+
| style="text-align: right;" | 1008.00
| style="text-align: right;" | 1016
+
| style="text-align: right;" | 1016.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1999-11-03
 
| 1999-11-03
 
| Perforation
 
| Perforation
| style="text-align: right;" | 754
+
| style="text-align: right;" | 754.00
| style="text-align: right;" | 755
+
| style="text-align: right;" | 755.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 1999-11-03
 
| 1999-11-03
 
| Perforation
 
| Perforation
| style="text-align: right;" | 745
+
| style="text-align: right;" | 745.00
| style="text-align: right;" | 746
+
| style="text-align: right;" | 746.00
 
| style="text-align: right;" | 17
 
| style="text-align: right;" | 17
 
|-
 
|-
 
| 1999-11-04
 
| 1999-11-04
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 745
+
| style="text-align: right;" | 745.00
| style="text-align: right;" | 755
+
| style="text-align: right;" | 755.00
| style="text-align: right;" | 0
 
|-
 
| 1999-11-07
 
| Perforation
 
| style="text-align: right;" | 750
 
| style="text-align: right;" | 751
 
| style="text-align: right;" | 20
 
|-
 
| 2003-05-16
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 732
 
| style="text-align: right;" | 740
 
| style="text-align: right;" | 0
 
|-
 
| 2003-05-20
 
| Perforation
 
| style="text-align: right;" | 601.5
 
| style="text-align: right;" | 602.5
 
| style="text-align: right;" | 17
 
|-
 
| 2003-05-20
 
| Cement Squeeze
 
| style="text-align: right;" | 601.5
 
| style="text-align: right;" | 602.5
 
| style="text-align: right;" | 0
 
|-
 
| 2003-06-29
 
| Hydra Jet Perforation
 
| style="text-align: right;" | 269.5
 
| style="text-align: right;" | 270
 
| style="text-align: right;" | 1
 
|-
 
| 2003-06-29
 
| Remedial Casing Cementing
 
| style="text-align: right;" | 269.5
 
| style="text-align: right;" | 270
 
| style="text-align: right;" | 0
 
|-
 
| 2003-06-29
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 258
 
| style="text-align: right;" | 267
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 172: Line 281:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Job Start Date
!scope="col" | Chemical Name
+
!scope="col" | Job End Date
!scope="col" style="text-align: right;" | CAS Number
+
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 205: Line 328:
 
| 1989
 
| 1989
 
| style="text-align: right;" | 99
 
| style="text-align: right;" | 99
| style="text-align: right;" | 12.7
 
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
| style="text-align: right;" | 20.5
+
| style="text-align: right;" | 0.0
 +
| style="text-align: right;" | 0.0
 
|-
 
|-
 
|}
 
|}
Line 213: Line 336:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Occurences ==
 
<!--== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 228: Line 351:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 21:45, 17 January 2021

Well Details

Well ID: 0064071216000
Loading map...
Location: 00/16-12-006-07W4/0
Location Alias: 00/16-12-06-07 W4M
Location Alias 2: 00/16-12-006-07 W4/00
Country: Canada
Province: Alberta
Township: 006
Meridian: 4
Range: 07
Section: 12
County/Municipality: County of Forty Mile No. 8
Well Name: CARDINAL ETZIKOM 16-12-6-7
Operator Name: Cardinal Energy Ltd.
License Number: 0090788
License Date: 1981-06-18
License Status: Abandoned
Spud Date: 1981-07-20
Final Drill Date: 1981-07-24
Well Total Depth: 1055.00 m
Surface Hole Latitude: 49.462010
Surface Hole Longitude: -110.817452

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-06-18 Obtained License
1981-07-24 Drill Stem Test Performed
1981-07-24 Finished Drilling
1981-07-25 Drill Stem Test Performed
1981-07-26 Production Casing Operation Performed
1981-07-31 Perforation Treatment Performed - Jet Perforation
1981-08-01 Perforation Treatment Performed - Cement Squeeze
1981-08-02 Perforation Treatment Performed - Jet Perforation
1981-08-03 Well Mode changed to Drilled and Cased
1989-07-01 Well Fluid changed to Gas
1989-07-01 Well Mode changed to Testing
1999-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-03 Perforation Treatment Performed - Jet Perforation
1999-11-04 Perforation Treatment Performed - Cement Squeeze
1999-11-07 Perforation Treatment Performed - Jet Perforation
2003-05-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-05-16 Plug Back Performed
2003-05-16 Well Log Performed
2003-05-16 Well Mode changed to Abandoned Zone
2003-05-18 Well Log Performed
2003-05-20 Perforation Treatment Performed - Cement Squeeze
2003-05-20 Perforation Treatment Performed - Jet Perforation
2003-05-20 Plug Back Performed
2003-05-21 Well Log Performed
2003-06-29 Perforation Treatment Performed - Abrasa-Jet Perforation
2003-06-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-06-29 Perforation Treatment Performed - Remedial Casing
2003-07-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-07-31 Perforation 1025.40 1025.70 13
1999-11-07 Perforation 750.00 751.00 20
2003-05-16 Packing Device Capped w/Cement 732.00 740.00 0
2003-05-20 Perforation 601.50 602.50 17
2003-05-20 Cement Squeeze 601.50 602.50 0
2003-06-29 Hydra Jet Perforation 269.50 270.00 1
2003-06-29 Remedial Casing Cementing 269.50 270.00 0
2003-06-29 Packing Device Capped w/Cement 258.00 267.00 0
1981-08-01 Cement Squeeze 1025.40 1025.70 0
1981-08-02 Perforation 749.80 750.00 13
1981-08-02 Perforation 754.00 755.00 17
1981-08-02 Perforation 745.00 746.00 17
1999-11-03 Packing Device Capped w/Cement 1008.00 1016.00 0
1999-11-03 Perforation 754.00 755.00 17
1999-11-03 Perforation 745.00 746.00 17
1999-11-04 Cement Squeeze 745.00 755.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 99 0.0 0.0 0.0

For data sources see[5]

References