X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0626020711000"

m
m
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 0626020711000
 
| Well ID: 0626020711000
| style="height=100%; align=center" rowspan="14" | {{#display_map: 54.351573, -118.292701 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="21" | {{#display_map: 54.351573, -118.292701 | width=100% | height=100% }}
 
|-
 
|-
 
| Location: 00/11-07-062-02W6/0
 
| Location: 00/11-07-062-02W6/0
Line 10: Line 10:
 
|-
 
|-
 
| Location Alias 2: 00/11-07-062-02 W6/00
 
| Location Alias 2: 00/11-07-062-02 W6/00
 +
|-
 +
| Country: Canada
 
|-
 
|-
 
| Province: Alberta
 
| Province: Alberta
 +
|-
 +
| Township: 062
 +
|-
 +
| Meridian: 6
 +
|-
 +
| Range: 02
 +
|-
 +
| Section: 07
 
|-
 
|-
 
| County/Municipality: [[Municipal District of Greenview No. 16,_Alberta|Municipal District of Greenview No. 16]]
 
| County/Municipality: [[Municipal District of Greenview No. 16,_Alberta|Municipal District of Greenview No. 16]]
Line 17: Line 27:
 
| Well Name: STRATH LATOR 11-7-62-2
 
| Well Name: STRATH LATOR 11-7-62-2
 
|-
 
|-
| Operator Name:  
+
| Operator Name: [[Strath Resources Ltd.]]
 
|-
 
|-
 
| License Number: 0074042
 
| License Number: 0074042
Line 29: Line 39:
 
| Final Drill Date: 1979-03-12
 
| Final Drill Date: 1979-03-12
 
|-
 
|-
| Well Total Depth: 3155 m
+
| Well Total Depth: 3155.00 m
 
|-
 
|-
 
| Surface Hole Latitude: 54.351573
 
| Surface Hole Latitude: 54.351573
Line 38: Line 48:
 
  | title = General Well Data File - Licensing Data
 
  | title = General Well Data File - Licensing Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref><ref>{{cite web
+
  | accessdate = 2020-05-07 }}</ref><ref>{{cite web
 
  | title = General Well Data File - Drilling Data
 
  | title = General Well Data File - Drilling Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1909-09-09
 +
| Well Log Performed
 +
|-
 +
| 1979-01-22
 +
| Obtained License
 +
|-
 +
| 1979-03-12
 +
| Finished Drilling
 +
|-
 +
| 1979-03-12
 +
| Well Mode changed to Drilled and Cased
 +
|-
 +
| 1979-03-17
 +
| Production Casing Operation Performed
 +
|-
 +
| 1979-03-30
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1979-03-31
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1979-04-05
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 1979-04-06
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1979-04-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1979-09-03
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1979-09-04
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1979-09-06
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1979-09-07
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1979-09-09
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1979-09-11
 +
| Perforation Treatment Performed - Cement Squeeze
 +
|-
 +
| 1979-09-14
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1979-09-17
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1979-09-19
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1979-10-30
 +
| Well Began Production
 +
|-
 +
| 1979-10-30
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1979-10-30
 +
| Well Mode changed to Pumping
 +
|-
 +
| 1979-11-03
 +
| Perforation Treatment Performed - Nitrogen Treatment
 +
|-
 +
| 1979-12-05
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1979-12-05
 +
| Well Mode changed to Suspended
 +
|-
 +
| 1980-01-15
 +
| Perforation Treatment Performed - Fractured
 +
|-
 +
| 1980-04-15
 +
| Perforation Treatment Performed - Jet Perforation
 +
|-
 +
| 1981-03-18
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 1981-03-18
 +
| Well Mode changed to Suspended
 +
|-
 +
| 2019-02-13
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2019-02-13
 +
| Plug Back Performed
 +
|-
 +
| 2019-02-13
 +
| Well Fluid changed to Crude Oil
 +
|-
 +
| 2019-02-13
 +
| Well Log Performed
 +
|-
 +
| 2019-02-13
 +
| Well Mode changed to Abandoned Zone
 +
|-
 +
| 2019-02-14
 +
| Perforation Treatment Performed - Abrasa-Jet Perforation
 +
|-
 +
| 2019-02-14
 +
| Perforation Treatment Performed - Cement Plug
 +
|-
 +
| 2019-02-14
 +
| Perforation Treatment Performed - Remedial Casing
 +
|-
 +
| 2019-02-14
 +
| Plug Back Performed
 +
|-
 +
| 2019-02-15
 +
| Perforation Treatment Performed - Bridge Plug Capped W/Cement
 +
|-
 +
| 2019-02-15
 +
| Plug Back Performed
 +
|-
 +
| 2019-02-15
 +
| Well Log Performed
 +
|-
 +
| 2019-02-25
 +
| Well Abandoned
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-04-29 }}</ref>
 
<!--== Spud Table ==
 
<!--== Spud Table ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 74: Line 222:
 
| 1979-03-30
 
| 1979-03-30
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2876
+
| style="text-align: right;" | 2876.00
| style="text-align: right;" | 2881
+
| style="text-align: right;" | 2881.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
|-
 
| 1979-03-31
 
| Fracture
 
| style="text-align: right;" | 2876
 
| style="text-align: right;" | 2881
 
| style="text-align: right;" | 0
 
|-
 
| 1979-04-05
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 2850
 
| style="text-align: right;" | 2850
 
| style="text-align: right;" | 0
 
|-
 
| 1979-04-06
 
| Perforation
 
| style="text-align: right;" | 2463
 
| style="text-align: right;" | 2468
 
| style="text-align: right;" | 13
 
|-
 
| 1979-04-06
 
| Fracture
 
| style="text-align: right;" | 2463
 
| style="text-align: right;" | 2468
 
| style="text-align: right;" | 0
 
|-
 
| 1979-09-03
 
| Perforation
 
| style="text-align: right;" | 2509
 
| style="text-align: right;" | 2510
 
| style="text-align: right;" | 13
 
|-
 
| 1979-09-04
 
| Cement Squeeze
 
| style="text-align: right;" | 2509
 
| style="text-align: right;" | 2510
 
| style="text-align: right;" | 0
 
|-
 
| 1979-09-06
 
| Perforation
 
| style="text-align: right;" | 2484
 
| style="text-align: right;" | 2485
 
| style="text-align: right;" | 13
 
|-
 
| 1979-09-07
 
| Cement Squeeze
 
| style="text-align: right;" | 2484
 
| style="text-align: right;" | 2485
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
| 1979-09-09
 
| 1979-09-09
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2463
+
| style="text-align: right;" | 2463.00
| style="text-align: right;" | 2464
+
| style="text-align: right;" | 2464.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1979-09-11
 
| 1979-09-11
| Cement Squeeze  
+
| Cement Squeeze
| style="text-align: right;" | 2463
+
| style="text-align: right;" | 2463.00
| style="text-align: right;" | 2468
+
| style="text-align: right;" | 2468.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1979-09-14
 
| 1979-09-14
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2467
+
| style="text-align: right;" | 2467.00
| style="text-align: right;" | 2469
+
| style="text-align: right;" | 2469.00
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 
|-
 
|-
 
| 1979-09-17
 
| 1979-09-17
| Fracture  
+
| Fracture
| style="text-align: right;" | 2467
+
| style="text-align: right;" | 2467.00
| style="text-align: right;" | 2469
+
| style="text-align: right;" | 2469.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1979-09-19
 
| 1979-09-19
| Fracture  
+
| Fracture
| style="text-align: right;" | 2467
+
| style="text-align: right;" | 2467.00
| style="text-align: right;" | 2469
+
| style="text-align: right;" | 2469.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1979-11-03
 
| 1979-11-03
| Nitrogen Squeeze
+
| Nitrogen Treatment
| style="text-align: right;" | 2467
+
| style="text-align: right;" | 2467.00
| style="text-align: right;" | 2469
+
| style="text-align: right;" | 2469.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1980-01-15
 
| 1980-01-15
| Fracture  
+
| Fracture
| style="text-align: right;" | 2467
+
| style="text-align: right;" | 2467.00
| style="text-align: right;" | 2469
+
| style="text-align: right;" | 2469.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1980-04-15
 
| 1980-04-15
 
| Perforation
 
| Perforation
| style="text-align: right;" | 2066.5
+
| style="text-align: right;" | 2066.50
| style="text-align: right;" | 2069
+
| style="text-align: right;" | 2069.00
 
| style="text-align: right;" | 20
 
| style="text-align: right;" | 20
 
|-
 
|-
 
| 2019-02-13
 
| 2019-02-13
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 2045.1
+
| style="text-align: right;" | 2045.10
| style="text-align: right;" | 2055
+
| style="text-align: right;" | 2055.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2019-02-14
 
| 2019-02-14
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 925.5
+
| style="text-align: right;" | 925.50
| style="text-align: right;" | 1185
+
| style="text-align: right;" | 1185.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-03-31
 +
| Fracture
 +
| style="text-align: right;" | 2876.00
 +
| style="text-align: right;" | 2881.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2019-02-14
 
| 2019-02-14
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 599
+
| style="text-align: right;" | 599.00
| style="text-align: right;" | 600
+
| style="text-align: right;" | 600.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2019-02-14
 
| 2019-02-14
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 665.4
+
| style="text-align: right;" | 665.40
| style="text-align: right;" | 925.5
+
| style="text-align: right;" | 925.50
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2019-02-14
 
| 2019-02-14
 
| Hydra Jet Perforation
 
| Hydra Jet Perforation
| style="text-align: right;" | 1154.9
+
| style="text-align: right;" | 1154.90
| style="text-align: right;" | 1155
+
| style="text-align: right;" | 1155.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2019-02-14
 
| 2019-02-14
| Cement Plug  
+
| Cement Plug
| style="text-align: right;" | 401.7
+
| style="text-align: right;" | 401.70
| style="text-align: right;" | 665.4
+
| style="text-align: right;" | 665.40
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2019-02-14
 
| 2019-02-14
 
| Hydra Jet Perforation
 
| Hydra Jet Perforation
| style="text-align: right;" | 599
+
| style="text-align: right;" | 599.00
| style="text-align: right;" | 600
+
| style="text-align: right;" | 600.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2019-02-14
 
| 2019-02-14
 
| Hydra Jet Perforation
 
| Hydra Jet Perforation
| style="text-align: right;" | 1062.9
+
| style="text-align: right;" | 1062.90
| style="text-align: right;" | 1063
+
| style="text-align: right;" | 1063.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2019-02-14
 
| 2019-02-14
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1154.9
+
| style="text-align: right;" | 1154.90
| style="text-align: right;" | 1155
+
| style="text-align: right;" | 1155.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2019-02-14
 
| 2019-02-14
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 1062.9
+
| style="text-align: right;" | 1062.90
| style="text-align: right;" | 1063
+
| style="text-align: right;" | 1063.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2019-02-14
 
| 2019-02-14
 
| Remedial Casing Cementing
 
| Remedial Casing Cementing
| style="text-align: right;" | 624.9
+
| style="text-align: right;" | 624.90
| style="text-align: right;" | 625
+
| style="text-align: right;" | 625.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2019-02-14
 
| 2019-02-14
 
| Hydra Jet Perforation
 
| Hydra Jet Perforation
| style="text-align: right;" | 624.9
+
| style="text-align: right;" | 624.90
| style="text-align: right;" | 625
+
| style="text-align: right;" | 625.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-04-05
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 2850.00
 +
| style="text-align: right;" | 2850.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2019-02-15
 
| 2019-02-15
 
| Packing Device Capped w/Cement
 
| Packing Device Capped w/Cement
| style="text-align: right;" | 585.1
+
| style="text-align: right;" | 585.10
| style="text-align: right;" | 595
+
| style="text-align: right;" | 595.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-04-06
 +
| Perforation
 +
| style="text-align: right;" | 2463.00
 +
| style="text-align: right;" | 2468.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1979-04-06
 +
| Fracture
 +
| style="text-align: right;" | 2463.00
 +
| style="text-align: right;" | 2468.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-09-03
 +
| Perforation
 +
| style="text-align: right;" | 2509.00
 +
| style="text-align: right;" | 2510.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1979-09-04
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2509.00
 +
| style="text-align: right;" | 2510.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1979-09-06
 +
| Perforation
 +
| style="text-align: right;" | 2484.00
 +
| style="text-align: right;" | 2485.00
 +
| style="text-align: right;" | 13
 +
|-
 +
| 1979-09-07
 +
| Cement Squeeze
 +
| style="text-align: right;" | 2484.00
 +
| style="text-align: right;" | 2485.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 256: Line 404:
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
  | title = General Well Data File - Tour-Perforation/Treatment Data
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-05-09
+
| date = 2020-04-22
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Start Date
+
!scope="col" | Job Number
!scope="col" | End Date
+
!scope="col" | Trade Name
!scope="col" | Chemical Name
+
!scope="col" | Supplier
!scope="col" style="text-align: right;" | CAS Number
 
 
!scope="col" | Purpose
 
!scope="col" | Purpose
!scope="col" style="text-align: right;" | Job Percentage
+
!scope="col" | Ingredient Name
!scope="col" | Supplier
+
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 
|}-->
 
|}-->
  
Line 289: Line 451:
 
| 1979
 
| 1979
 
| style="text-align: right;" | 718
 
| style="text-align: right;" | 718
| style="text-align: right;" | 12.5
+
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
 
| style="text-align: right;" | 0.0
Line 297: Line 459:
 
  | title = Well Production Data - All Alberta
 
  | title = Well Production Data - All Alberta
 
|publisher = [[Alberta Energy Regulator]]
 
|publisher = [[Alberta Energy Regulator]]
| date = 2018-04-24
+
| date = 2020-04-25
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
  | accessdate = 2018-05-14 }}</ref>
+
  | accessdate = 2020-05-07 }}</ref>
<!--== Occurences ==
+
== Occurences ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Occurence Date
 
!scope="col" | Occurence Date
Line 307: Line 469:
 
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 
!scope="col" style="text-align: right;" | Occurence Control Depth (m)
 
|-
 
|-
|}-->
+
| 1980-04-15
 
+
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
| 2019-02-16
 +
| No Incident Encountered
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0.00
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = General Well Data File - Tour-Occurence Data
 +
|publisher = [[Alberta Energy Regulator]]
 +
| date = 2020-04-22
 +
| url = http://wellwiki.org/wiki/Alberta_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-05-07 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 20:15, 17 January 2021

Well Details

Well ID: 0626020711000
Loading map...
Location: 00/11-07-062-02W6/0
Location Alias: 00/11-07-62-02 W6M
Location Alias 2: 00/11-07-062-02 W6/00
Country: Canada
Province: Alberta
Township: 062
Meridian: 6
Range: 02
Section: 07
County/Municipality: Municipal District of Greenview No. 16
Well Name: STRATH LATOR 11-7-62-2
Operator Name: Strath Resources Ltd.
License Number: 0074042
License Date: 1979-01-22
License Status: Abandoned
Spud Date: 1979-01-23
Final Drill Date: 1979-03-12
Well Total Depth: 3155.00 m
Surface Hole Latitude: 54.351573
Surface Hole Longitude: -118.292701

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-01-22 Obtained License
1979-03-12 Finished Drilling
1979-03-12 Well Mode changed to Drilled and Cased
1979-03-17 Production Casing Operation Performed
1979-03-30 Perforation Treatment Performed - Jet Perforation
1979-03-31 Perforation Treatment Performed - Fractured
1979-04-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-04-06 Perforation Treatment Performed - Fractured
1979-04-06 Perforation Treatment Performed - Jet Perforation
1979-09-03 Perforation Treatment Performed - Jet Perforation
1979-09-04 Perforation Treatment Performed - Cement Squeeze
1979-09-06 Perforation Treatment Performed - Jet Perforation
1979-09-07 Perforation Treatment Performed - Cement Squeeze
1979-09-09 Perforation Treatment Performed - Jet Perforation
1979-09-11 Perforation Treatment Performed - Cement Squeeze
1979-09-14 Perforation Treatment Performed - Jet Perforation
1979-09-17 Perforation Treatment Performed - Fractured
1979-09-19 Perforation Treatment Performed - Fractured
1979-10-30 Well Began Production
1979-10-30 Well Fluid changed to Crude Oil
1979-10-30 Well Mode changed to Pumping
1979-11-03 Perforation Treatment Performed - Nitrogen Treatment
1979-12-05 Well Fluid changed to Crude Oil
1979-12-05 Well Mode changed to Suspended
1980-01-15 Perforation Treatment Performed - Fractured
1980-04-15 Perforation Treatment Performed - Jet Perforation
1981-03-18 Well Fluid changed to Crude Oil
1981-03-18 Well Mode changed to Suspended
2019-02-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-13 Plug Back Performed
2019-02-13 Well Fluid changed to Crude Oil
2019-02-13 Well Log Performed
2019-02-13 Well Mode changed to Abandoned Zone
2019-02-14 Perforation Treatment Performed - Abrasa-Jet Perforation
2019-02-14 Perforation Treatment Performed - Cement Plug
2019-02-14 Perforation Treatment Performed - Remedial Casing
2019-02-14 Plug Back Performed
2019-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-02-15 Plug Back Performed
2019-02-15 Well Log Performed
2019-02-25 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-03-30 Perforation 2876.00 2881.00 7
1979-09-09 Perforation 2463.00 2464.00 13
1979-09-11 Cement Squeeze 2463.00 2468.00 0
1979-09-14 Perforation 2467.00 2469.00 13
1979-09-17 Fracture 2467.00 2469.00 0
1979-09-19 Fracture 2467.00 2469.00 0
1979-11-03 Nitrogen Treatment 2467.00 2469.00 0
1980-01-15 Fracture 2467.00 2469.00 0
1980-04-15 Perforation 2066.50 2069.00 20
2019-02-13 Packing Device Capped w/Cement 2045.10 2055.00 0
2019-02-14 Cement Plug 925.50 1185.00 0
1979-03-31 Fracture 2876.00 2881.00 0
2019-02-14 Remedial Casing Cementing 599.00 600.00 0
2019-02-14 Cement Plug 665.40 925.50 0
2019-02-14 Hydra Jet Perforation 1154.90 1155.00 0
2019-02-14 Cement Plug 401.70 665.40 0
2019-02-14 Hydra Jet Perforation 599.00 600.00 0
2019-02-14 Hydra Jet Perforation 1062.90 1063.00 0
2019-02-14 Remedial Casing Cementing 1154.90 1155.00 0
2019-02-14 Remedial Casing Cementing 1062.90 1063.00 0
2019-02-14 Remedial Casing Cementing 624.90 625.00 0
2019-02-14 Hydra Jet Perforation 624.90 625.00 0
1979-04-05 Packing Device Capped w/Cement 2850.00 2850.00 0
2019-02-15 Packing Device Capped w/Cement 585.10 595.00 0
1979-04-06 Perforation 2463.00 2468.00 13
1979-04-06 Fracture 2463.00 2468.00 0
1979-09-03 Perforation 2509.00 2510.00 13
1979-09-04 Cement Squeeze 2509.00 2510.00 0
1979-09-06 Perforation 2484.00 2485.00 13
1979-09-07 Cement Squeeze 2484.00 2485.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 718 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1980-04-15 No Incident Encountered 0.00 0.00
2019-02-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References