X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0364013313024"

m
m
 
Line 273: Line 273:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 17:37, 17 January 2021

Well Details

Well ID: 0364013313024
Loading map...
Location: 02/13-33-036-01W4/4
Location Alias: 02/13-33-36-01 W4M
Location Alias 2: 02/13-33-036-01 W4/04
Country: Canada
Province: Alberta
Township: 036
Meridian: 4
Range: 01
Section: 33
County/Municipality: Municipal District of Provost No. 52
Well Name: Caltex_Res PROVOST 12-33-36-1
Operator Name: Caltex Resources Ltd.
License Number: 0154428
License Date: 1992-11-09
License Status: Amended
Spud Date: 1992-11-17
Final Drill Date: 1993-07-21
Well Total Depth: 1810.00 m
Surface Hole Latitude: 52.132385
Surface Hole Longitude: -110.102132

For data sources see[1][2]

Well History

Date Event
1992-11-09 Obtained License
1992-11-17 Surface Casing Operation Performed
1992-11-18 Direction Drilling Operation Performed - Horizontal
1992-11-20 Intermediate Casing Operation Performed
1992-11-22 Direction Drilling Operation Performed - Horizontal
1993-07-16 Well Log Performed
1993-07-17 Direction Drilling Operation Performed - Horizontal
1993-07-20 Well Log Performed
1993-07-21 Finished Drilling
1993-07-21 Well Mode changed to Drilled and Cased
1993-07-22 Liner Casing Operation Performed
1993-07-22 Perforation Treatment Performed - Slotted Liner or Casing
1993-07-22 Rig Released
1993-07-28 Well Log Performed
2009-07-27 Perforation Treatment Performed - Cement Plug
2017-04-25 Perforation Treatment Performed - Jet Perforation
2017-05-28 Well Began Production
2017-05-28 Well Fluid changed to Water
2017-05-28 Well Type changed to Source
2017-10-01 Well Type changed to Observation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-11-18 105.00 Horizontal
1992-11-22 1155.00 Horizontal
1993-07-17 667.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-07-22 Slotted Liner 884.50 1810.00 0
2009-07-27 Cement Plug 539.00 994.00 0
2017-04-25 Perforation 177.00 194.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 96 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-05-27 No Incident Encountered 0.00 0.00

For data sources see[7]

References