If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 96: | Line 96: | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Wells]] |
Well ID: 37-125-24880 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.040344,"lon":-80.352494,"icon":""}]} |
County: Washington | |
Municipality: Morris Township | |
Operator Name: CNX GAS CO LLC | |
Well Pad ID: 144585 | |
Farm/Lease Name: CRUM NV55FHS | |
First Permit Date: 2012-11-07 | |
Last Permit Date: 2012-11-07 | |
Spud Date: 2013-01-03 | |
Unconventional: Yes | |
Horizontal: Yes | |
Producing: Yes | |
Violations: None | |
Latitude: 40.040344 | |
Longitude: -80.352494 |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
2119825 | 2012-11-08 | No Violations Noted | On November 8, 2012, Environmental Trainee, Carl Livermore and I stopped at CONSOL’s NV-55 site to conduct a pre-drill inspection of their perimeter E&S controls.
The E&S Plans were in the on-site mailbox and I pulled them and walked the site perimeter to check them against what was installed. For the most part they matched, although I noted that the contractor added silt fence that wasn’t in the original plans. This is not a problem but it needs to be added to the plans and be initialed by a WQS. CONSOL is using silt sox as their primary perimeter controls; we found some areas that were in danger of being overrun with sediment and some areas that the silt sox was damaged. Additionally, in some areas the silt fence was not installed properly and in at least one area there was a animal tunnel under the fence. CONSOL’s contractor had the site stabilized via hydroseeding. CONSOL has met pre- operation inspection obligation as outlined under 3258( a)( 1). |
|
2120144 | 2012-11-21 | No Violations Noted | On November 21, 2012, I conducted a follow-up inspection at CONSOL’s NV-55 site. The site was completely inactive and there wasn’t even anybody in the guard shack. I checked the E&S BMPs but it did not appear that any maintenance had been performed on them.
I will follow-up with CONSOL with this. |
|
2142642 | 2013-02-12 | No Violations Noted |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|