If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 151: | Line 151: | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Wells]] |
Well ID: 37-063-36564 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.432057,"lon":-79.093991,"icon":""}]} |
Operator Name: PENN VIEW EXPLORATION CORP | |
First Permit Date: 2009-06-10 | |
Last Permit Date: 2009-06-10 | |
Spud Date: 2009-10-30 | |
Unconventional: No | |
Horizontal: No | |
Violations: None | |
Latitude: 40.432057 | |
Longitude: -79.093991 |
PERIOD | GAS QUANTITY | GAS PRODUCTION DAYS | CONDENSATE QUANTITY | CONDENSATE PRODUCTION DAYS | OIL QUANTITY | OIL PRODUCTION DAYS |
---|---|---|---|---|---|---|
2013-0 | 1130.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2012-0 | 1232.0 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2011-0 | 3026.89 | 365.0 | 0.0 | 0.0 | 0.0 | 0.0 |
2010-0 | 5649.0 | 276.0 | 0.0 | 0.0 | 0.0 | 0.0 |
PERIOD | TYPE | QUANTITY | UNITS | DISPOSAL METHOD | WASTE FACILITY PERMIT ID | WASTE FACILITY NAME | FACILITY CITY | FACILITY STATE |
---|---|---|---|---|---|---|---|---|
2010-0 | PRODUCED FLUID | 60.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 | PA BRINE TRT INC - JOSEPHINE PLT, INDIANA COUNTY | JOSEPHINE | PA |
2010-0 | PRODUCED FLUID | 65.0 | Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 | TUNNELTON LIQUIDS COMPANY | SALTSBURG | PA |
INSPECTION ID | DATE | DESCRIPTION | COMMENT | VIOLATION ID |
---|---|---|---|---|
1840922 | 2009-11-04 | No Violations Noted | Currently, E&L drilling currently at 1550 ft. Universal Drilling was in the process of cementing the 7¿ pipe. Well site was identified with well sign and E&S plan. No IW and E&S issues at the time of inspection. Pit aligned with 20 mil plastic and had no freeboard issues. Filter fence located topographically down gradient of site pad. Conductor pipe set at 42.28 ft. 9 5/8¿ pipe set at 412.30 ft with 150 sks class A with 9 bbl return. Water indicated at 120 ft. and 560 ft. No gas indicated nor voids on the boring logs. Stratigraphy consisted of shale, sandstone, limestone, and coal seams. | |
1840923 | 2009-11-04 | No Violations Noted | Currently, E&L drilling currently at 1550 ft. Universal Drilling was in the process of cementing the 7¿ pipe. Well site was identified with well sign and E&S plan. No IW and E&S issues at the time of inspection. Pit aligned with 20 mil plastic and had no freeboard issues. Filter fence located topographically down gradient of site pad. Conductor pipe set at 42.28 ft. 9 5/8¿ pipe set at 412.30 ft with 150 sks class A with 9 bbl return. Water indicated at 120 ft. and 560 ft. No gas indicated nor voids on the boring logs. Stratigraphy consisted of shale, sandstone, limestone, and coal seams. | |
1842219 | 2009-11-02 | No Violations Noted | At the time of inspection, the site was properly signed and E&S plan was available for review. The rig was setting up in preparation for drilling. Temporary stream crossing was correctly constructed. Filter fabric fence had been properly installed and functioning along with a grub/brush filter. No accelerated E&S issues were observed in relation to well site or access road, although operator should continue to monitor access road for erosion and sedimentation due to slope of roadway. Pits were properly constructed, but not yet lined, reminded operator to properly secure liner when placing in pit. All disturbed areas were temporarily seeded. | |
1928294 | 2010-11-18 | No Violations Noted | During this inspection, well properly tagged and in production. Site restored with 70% vegetative cover. It is recommended that operator reseed cut slope in spring to ensure uniform coverage. No accelerated erosion or sedimentation issues were noted in relation to well site or access road. No IW concerns noted. Brine tank stable. Operator may remove filter fence as 70% vegetative, permanent stabilization has been reached. Access road stable. Minor stream crossing(GP-7 approved) properly installed and functioning; appers riprap has been add to stream banks; therefore hay bale reinforced filter fence may be removed if permanent stabilization to stream bank/bottom is maintained along crossing | |
2038836 | 2012-01-27 | No Violations Noted | Drilling complete. Tag, tank, e&s ok. Filter fence should be removed. |