m (Maintenance script moved page 42-125-24303 to 37-125-24303: -i0) |
m |
||
(11 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | __TOC__ | ||
== Well Details == | == Well Details == | ||
− | {| class="wikitable" width="95%" | + | {| class="wikitable welldetails" width="95%" |
− | | Well ID: | + | | Well ID: 37-125-24303 |
− | | style=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.466861, -80.351417 | width=100% | height=100% }} |
+ | |- | ||
+ | | Country: United States | ||
+ | |- | ||
+ | | State: Pennsylvania | ||
+ | |- | ||
+ | | County: [[Washington_County,_Pennsylvania|Washington]] | ||
|- | |- | ||
− | | | + | | Municipality: [[Robinson Township,_Washington_County,_Pennsylvania|Robinson Township]] |
|- | |- | ||
− | | | + | | Operator Name: [[CHEVRON APPALACHIA LLC]] |
|- | |- | ||
− | | | + | | Well Pad ID: [[147136]] |
|- | |- | ||
| Farm/Lease Name: ROBINHILL 21H | | Farm/Lease Name: ROBINHILL 21H | ||
|- | |- | ||
− | | | + | | License Status: |
|- | |- | ||
− | | | + | | Spud Date: |
|- | |- | ||
− | | | + | | Permit Date: 2010-10-19 |
|- | |- | ||
− | | | + | | Well Type: GAS |
|- | |- | ||
− | | | + | | Unconventional Well: Y |
|- | |- | ||
− | | | + | | Configuration: Horizontal Well |
|- | |- | ||
− | | | + | | Conservation: Yes |
|- | |- | ||
| Latitude: 40.466861 | | Latitude: 40.466861 | ||
|- | |- | ||
− | | Longitude: -80. | + | | Longitude: -80.351417 |
− | |||
|} | |} | ||
− | + | For data sources see<ref>{{cite web | |
− | == Well | + | | title = Permits Issued Detail Report |
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref><ref>{{cite web | ||
+ | | title = Spud Data Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-04-30 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
+ | | title = Oil and Gas Well Pad Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Date |
− | !scope="col" | | + | !scope="col" | Event |
− | |||
− | |||
− | |||
|- | |- | ||
− | + | | 2010-10-19 | |
− | | 2010- | + | | New Permit Application |
− | | | + | |- |
− | | | + | | 2010-12-14 |
− | | | + | | Performed Spud Operation |
|- | |- | ||
+ | | 2011-02-17 | ||
+ | | Drilling Completion | ||
|- | |- | ||
− | | | + | | 2011-04-11 |
− | + | | Perforation | |
− | |||
− | |||
− | | | ||
|- | |- | ||
+ | | 2011-04-11 | ||
+ | | Performed Stimulation | ||
|- | |- | ||
− | | | + | | 2012-03-27 |
− | + | | DEVIATED | |
− | |||
− | |||
− | | | ||
|- | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
+ | == Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
|- | |- | ||
− | | | + | | 1 |
− | | 2011- | + | | 2011-04-13 |
− | | | + | | 2011-04-13 |
− | | | + | | style="text-align: right;" | 5,840 |
− | | | + | | style="text-align: right;" | 3,611,396 |
+ | | style="text-align: right;" | | ||
|- | |- | ||
+ | |} | ||
+ | ==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
|- | |- | ||
− | | | + | |- valign="top" |
− | | | + | | rowspan="9"| 1 |
− | | | + | | rowspan="1"| Sand |
− | | | + | | rowspan="1"| |
− | + | | rowspan="1"| Proppant | |
− | |||
| | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| | | | ||
+ | | style="text-align: right;" | 100.00 | ||
+ | | style="text-align: right;" | 10.48 | ||
+ | | style="text-align: right;" | | ||
|- | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="0"| | ||
+ | | rowspan="0"| | ||
+ | | rowspan="0"| Used to open perfs | ||
+ | |- valign="top" | ||
+ | | rowspan="0"| | ||
+ | | rowspan="0"| | ||
+ | | rowspan="0"| Scale Inhibitor | ||
+ | |- valign="top" | ||
+ | | rowspan="1"| | ||
+ | | rowspan="1"| | ||
+ | | rowspan="1"| Friction Reducer | ||
+ | | Distillates, petroleum, hydrotreated light | ||
+ | | 64742-47-8 | ||
+ | | style="text-align: right;" | 30.00 | ||
+ | | style="text-align: right;" | 0.02 | ||
+ | | style="text-align: right;" | | ||
|- | |- | ||
− | | | + | |- valign="top" |
− | | | + | | rowspan="1"| Water |
− | | | + | | rowspan="1"| |
− | | | + | | rowspan="1"| Carrier/Base Fluid |
| | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| | | | ||
+ | | style="text-align: right;" | 100.00 | ||
+ | | style="text-align: right;" | 89.52 | ||
+ | | style="text-align: right;" | | ||
|- | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="0"| | ||
+ | | rowspan="0"| | ||
+ | | rowspan="0"| Biocide | ||
+ | |- valign="top" | ||
+ | | rowspan="6"| | ||
+ | | rowspan="6"| | ||
+ | | rowspan="6"| Water Viscosifier | ||
+ | | Hydrochloric acid | ||
+ | | 7647-01-0 | ||
+ | | style="text-align: right;" | 32.00 | ||
+ | | style="text-align: right;" | 1.31 | ||
+ | | style="text-align: right;" | | ||
|- | |- | ||
− | | | + | | Carboxymethylhydroxyporoyl guar bln |
− | |||
− | |||
− | |||
| | | | ||
+ | | style="text-align: right;" | 100.00 | ||
+ | | style="text-align: right;" | 0.01 | ||
+ | | style="text-align: right;" | | ||
|- | |- | ||
+ | | 2,2-Dibromo-3-nitrilopropionamide | ||
+ | | 10222-01-2 | ||
+ | | style="text-align: right;" | 30.00 | ||
+ | | style="text-align: right;" | 0.00600000 | ||
+ | | style="text-align: right;" | | ||
|- | |- | ||
− | | | + | | Polyethylene glycol |
− | | | + | | 25322-68-3 |
− | | | + | | style="text-align: right;" | 60.00 |
− | | | + | | style="text-align: right;" | 0.01 |
− | | | + | | style="text-align: right;" | |
|- | |- | ||
+ | | Ethylene glycol | ||
+ | | 107-21-1 | ||
+ | | style="text-align: right;" | 30.00 | ||
+ | | style="text-align: right;" | 0.00600000 | ||
+ | | style="text-align: right;" | | ||
|- | |- | ||
− | | | + | | Dibromoacetonitrile |
− | | | + | | 3252-43-5 |
− | | | + | | style="text-align: right;" | 5.00 |
− | | | + | | style="text-align: right;" | 0.00100000 |
− | | | + | | style="text-align: right;" | |
|- | |- | ||
+ | |- valign="top" | ||
+ | | rowspan="0"| | ||
+ | | rowspan="0"| | ||
+ | | rowspan="0"| Iron Control Agent | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =FracFocus Fracking Chemicals Database | ||
+ | | date = 2019-04-02 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-06-19 }}</ref> | ||
+ | == Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
|- | |- | ||
− | | | + | | 2011-04-11 |
− | + | | style="text-align: right;" | | |
− | | | ||
− | | | ||
− | + | | style="text-align: right;" | 0 | |
− | + | | style="text-align: right;" | 0 | |
− | + | | style="text-align: right;" | 0 | |
− | |||
− | | | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Completion Reports - Stimulations | ||
+ | | publisher = Pennsylvania Department of Conservation and Natural Resources | ||
+ | | date = 2020-03-02 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-03-02 }}</ref> | ||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator Name |
− | !scope="col" | | + | !scope="col" | Gas Quantity (mcf) |
− | !scope="col" | | + | !scope="col" | Gas Production Days |
− | !scope="col" | | + | !scope="col" | Oil Quantity (bbl) |
− | !scope="col" | | + | !scope="col" | Oil Production Days |
− | !scope="col" | | + | !scope="col" | Water Quantity (bbl) |
− | + | !scope="col" | Water Production Days | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
|- | |- | ||
− | | | + | | 2010 |
− | | style="text-align:right;" | | + | | [[ATLAS RESOURCES LLC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2011 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 43,316.00 | ||
+ | | style="text-align: right;" | 17 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 724.73 | ||
+ | | style="text-align: right;" | 17 | ||
|- | |- | ||
− | | | + | | 2012 |
− | | style="text-align:right;" | | + | | [[CHEVRON APPALACHIA LLC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 519,389.00 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 366 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 1,572.25 |
+ | | style="text-align: right;" | 366 | ||
|- | |- | ||
+ | | 2013 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 296,612.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 446.16 | ||
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
− | | | + | | 2014 |
− | | style="text-align:right;" | | + | | [[CHEVRON APPALACHIA LLC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 345,234.00 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 365 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 114.51 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 184 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 1,229.70 |
+ | | style="text-align: right;" | 365 | ||
|- | |- | ||
+ | | 2015 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 217,390.00 | ||
+ | | style="text-align: right;" | 281 | ||
+ | | style="text-align: right;" | 331.58 | ||
+ | | style="text-align: right;" | 130 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2016 |
− | | style="text-align:right;" | 0. | + | | [[CHEVRON APPALACHIA LLC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
+ | | 2017 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
− | | | + | | 2019 |
− | | style="text-align:right;" | 0. | + | | [[CHEVRON APPALACHIA LLC]] |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
− | | style="text-align:right;" | 0. | + | | style="text-align: right;" | 0 |
− | | style="text-align:right;" | | + | | style="text-align: right;" | 0.00 |
+ | | style="text-align: right;" | 0 | ||
|- | |- | ||
|} | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
== Waste Data == | == Waste Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
− | !scope="col" | | + | !scope="col" | Period |
− | !scope="col" | | + | !scope="col" | Operator |
− | !scope="col" | | + | !scope="col" | Waste Type |
− | !scope="col" | | + | !scope="col" | Quantity |
− | !scope="col" | | + | !scope="col" | Disposal Method |
− | !scope="col" | | + | !scope="col" | Waste Facility ID |
− | |||
− | |||
− | |||
|- | |- | ||
− | | | + | | 2011 |
− | | | + | | [[CHEVRON APPALACHIA LLC]] |
− | | style="text-align:right;" | | + | | Fracing Fluid Waste |
− | + | | style="text-align: right;" | 4,305.00 Bbl | |
− | | | + | | CENTRALIZED TREATMENT PLANT FOR RECYCLE |
− | | 34- | + | | 34-007-24355 |
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2011 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 1,035.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | WMGR123SW001 | ||
|- | |- | ||
− | | 2011 | + | | 2011 |
− | | | + | | [[CHEVRON APPALACHIA LLC]] |
− | | style="text-align:right;" | | + | | Drilling Fluid Waste |
− | + | | style="text-align: right;" | 100.00 Bbl | |
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | 34-007-24355 |
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2011 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Fracing Fluid Waste | ||
+ | | style="text-align: right;" | 85.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0095273 | ||
|- | |- | ||
− | | 2011 | + | | 2011 |
− | | | + | | [[CHEVRON APPALACHIA LLC]] |
− | | style="text-align:right;" | | + | | Produced Fluid |
− | | Bbl | + | | style="text-align: right;" | 78.00 Bbl |
+ | | IDENTIFY METHOD IN COMMENTS | ||
+ | | 34-167-29359 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 440.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | PA0101508 |
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2011 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,300.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | 301353 | ||
+ | |- | ||
+ | | 2011 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 537.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-121-2-3995 | ||
|- | |- | ||
− | | 2011 | + | | 2011 |
− | | | + | | [[CHEVRON APPALACHIA LLC]] |
− | | style="text-align:right;" | | + | | Fracing Fluid Waste |
− | + | | style="text-align: right;" | 7,820.00 Bbl | |
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | 301353 |
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2011 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Drilling Fluid Waste | ||
+ | | style="text-align: right;" | 340.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | PA0091472 | ||
|- | |- | ||
− | | 2011 | + | | 2011 |
− | | | + | | [[CHEVRON APPALACHIA LLC]] |
− | | style="text-align:right;" | | + | | Drilling Fluid Waste |
− | + | | style="text-align: right;" | 8,534.00 Bbl | |
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | 301353 |
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2011 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 615.00 Bbl | ||
+ | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
+ | | 34-007-24355 | ||
|- | |- | ||
− | | 2011 | + | | 2011 |
− | | | + | | [[CHEVRON APPALACHIA LLC]] |
− | | style="text-align:right;" | | + | | Fracing Fluid Waste |
− | + | | style="text-align: right;" | 345.00 Bbl | |
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | 34- | + | | PA0091472 |
− | | | + | |- |
− | | | + | | 2012 |
− | | | + | | [[CHEVRON APPALACHIA LLC]] |
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 5,365.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-121-23995 | ||
+ | |- | ||
+ | | 2013 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 1,084.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-121-23995 | ||
+ | |- | ||
+ | | 2014 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 2,370.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-121-23995 | ||
+ | |- | ||
+ | | 2015 | ||
+ | | [[CHEVRON APPALACHIA LLC]] | ||
+ | | Produced Fluid | ||
+ | | style="text-align: right;" | 895.00 Bbl | ||
+ | | INJECTION DISPOSAL WELL | ||
+ | | 34-121-23995 | ||
|- | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Waste Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Inspection Category | ||
+ | !scope="col" | Inspection Date | ||
+ | !scope="col" | Inspection Type | ||
+ | !scope="col" | Inspection Result | ||
+ | !scope="col" | Inspection Comments | ||
|- | |- | ||
− | | | + | | 1938168 |
− | | | + | | Primary Facility |
− | | | + | | 2010-12-16 |
− | | | + | | Drilling/Alteration |
− | | | + | | No Violations Noted |
− | | | + | | Randsom - Well spud, site still under construction , E&S in place on main pad, |
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1944794 | ||
+ | | Primary Facility | ||
+ | | 2010-11-16 | ||
+ | | Complaint Inspection | ||
+ | | No Violations Noted | ||
+ | | | ||
|- | |- | ||
− | | | + | | 1951144 |
− | | | + | | Primary Facility |
− | | | + | | 2011-01-13 |
− | | | + | | Routine/Complete Inspection |
− | | | + | | No Violations Noted |
− | | | + | | On January 13th, 2011 I conducted an inspection of the above site. A portion of the fill side of the pad had sliped during construction. I met with Atlas representatives Gary Bowlen, Chad Eisenman, and Nick Staffieri on site. The fill side was still an estimated 14' below the proposed finished elevation. Multiple scarp faces were evident with a vetical separation of over 20' at the greatest. All material that moved stayed within the limit of disturbance. Some material had entered the interceptor channel at the base of the slope. No streams or watercourses are in close proximity to the base of the slope. The material that slid appeared dry and no springs or seeps were observed. The operator is to install additional E&S controls around the base of the slide and forward the reconstruction plan once designed. |
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1953092 | ||
+ | | Primary Facility | ||
+ | | 2011-01-25 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | On January 25th, 2011 I conducted a follow up inspection of the site in response to the slide and inspection on January 13th, 2011. Additioanl E&S controls were installed on the lower edge at the toe of the slip. During excavation and reconstruction the material began to move again. A scarp face of approximately 4' had developed. Constructed had halted until the engineers can evaluate the soil conditions and formualte a new plan for the excavation. | ||
|- | |- | ||
− | | | + | | 1957864 |
− | | | + | | Primary Facility |
− | | | + | | 2011-02-04 |
− | | | + | | Routine/Complete Inspection |
− | | | + | | No Violations Noted |
− | | | + | | On February 4th, 2011 I conducted a follow up inspection of the site in response to the slide and inspection on January 13th and 25th, 2011. The lower side of the pad continues to slip during excavation. Construction efforts had been stopped. Temporary E&S controls put in place will remain in place until drilling is completed. After drilling is completed reclamation procedures are to start immediately, The rig was moving onsite today. A Site ID and E&S plan were posted onsite. The access road was in good condition. No spills/ leaks were observed at the time of inspection. |
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1958492 | ||
+ | | Primary Facility | ||
+ | | 2011-02-09 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | On February 9th, 2011 I conducted a follow up inspection of the site in response to the slide and inspections on January 13th and 25th, 2011. No new movement was observed. Construction efforts had been stopped. Temporary E&S controls put in place will remain in place until drilling is completed. After drilling is completed reclamation procedures are to start immediately. Drilling was started. A Site ID and E&S plan were posted onsite. The access road was in good condition. The pit appeared to be in good condition. No spills/ leaks were observed at the time of inspection. | ||
|- | |- | ||
− | | | + | | 1961856 |
− | | | + | | Primary Facility |
− | | | + | | 2011-03-10 |
− | | | + | | Routine/Complete Inspection |
− | | | + | | No Violations Noted |
− | | | + | | On March 10th 2011 I conducted a routine inspection of the above site. Drilling was completed and the rig had moved offsite. The drill cuttings were being removed with an excavator and being hauled offsite. No additional movement was observed on the slide. The access road was in good condition. A site ID and E&S plan were posted on site. Excess runoff from the pad was beginning to crate a ditch and flow around the sediment trap. Some material upslope of the sediment trap had slid into the trap. Water flowing around the trap was undermining the filter sock and flowing into a wooded area approx 200¿. No streams or watercourses close. Crews were on site immediately to divert water into the sediment trap, a diversion was built at the top of the pad, and repairs and additions were made to the filter sock. |
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 1961858 | ||
+ | | Primary Facility | ||
+ | | 2011-03-11 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | On March 11th 2011 I conducted a follow up inspection of the above site in response to the inspection on 3/10/2011. Straw bales had been added to the slope approaching the sediment trap to divert water into the trap. Straw bales had been added behind the filter sock below the sediment trap and repairs were made to the sediment trap. No more erosion was evident. All activities were within the limit of disturbance | ||
|- | |- | ||
− | | | + | | 1992019 |
− | | | + | | Primary Facility |
− | | | + | | 2011-06-27 |
− | | | + | | Routine/Complete Inspection |
− | | | + | | No Violations Noted |
− | | | + | | On June 27th 2011 I conducted a routine inspection of the above site. Drilling was completed and production units were being installed. The pit was closed. The slide on the fill slope was not yet repaired awaiting restoration of the site. The access road was in good condition, Site ID and E&S plan were posted on site. No erosion was leaving site and was contained within the E&S controls. The operator should continue to monitor and inspection the E&S controls routinely and after each runoff event until site restoration is complete and permanent stabilization is established. |
− | |||
− | |||
− | |||
|- | |- | ||
+ | | 2083597 | ||
+ | | Primary Facility | ||
+ | | 2012-07-12 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Looked at small slide on Robinhill #21. Small enough that they don't need a ESCPG-01. I will continue to monitor. | ||
|- | |- | ||
− | | | + | | 2085188 |
− | | | + | | Primary Facility |
− | | | + | | 2012-07-20 |
− | + | | Routine/Complete Inspection | |
− | + | | No Violations Noted | |
− | + | | | |
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
+ | | 2094821 | ||
+ | | Primary Facility | ||
+ | | 2012-08-22 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | On August 22, 2012, I stopped for a routine inspection at Chevron’s Robinhill #21; I met with Blake Loke, Matthew Barch and others. | ||
|- | |- | ||
− | | | + | | 2163803 |
− | | | + | | Primary Facility |
− | | | + | | 2013-04-16 |
− | + | | Routine/Complete Inspection | |
− | + | | No Violations Noted | |
− | | | ||
− | | | ||
| | | | ||
+ | |- | ||
+ | | 2212401 | ||
+ | | Primary Facility | ||
+ | | 2013-10-09 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
| | | | ||
|- | |- | ||
+ | | 2300600 | ||
+ | | Primary Facility | ||
+ | | 2014-07-29 | ||
+ | | Site Restoration | ||
+ | | No Violations Noted | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2353960 |
− | + | | Primary Facility | |
− | + | | 2015-03-19 | |
− | | | + | | Routine/Complete Inspection |
− | | | + | | No Violations Noted |
− | + | | | |
− | | | ||
− | | | ||
− | | | ||
|- | |- | ||
+ | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Violation Date | ||
+ | !scope="col" | Date Resolved | ||
+ | !scope="col" | Violation Code | ||
+ | !scope="col" | Violation Type | ||
+ | !scope="col" | Violation Comments | ||
|- | |- | ||
− | | | + | |}--> |
− | | | + | <!--==== Penalties Applied ==== |
− | | | + | {| class="wikitable sortable" width="95%" |
− | | | + | !scope="col" | Violation ID |
− | | | + | !scope="col" | Penalty ID |
− | | | + | !scope="col" | Penalty Code |
− | | | + | !scope="col" | Penalty Status |
− | | | + | !scope="col" | Penalty Date |
− | | | + | !scope="col" | Enforcement Date |
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
|- | |- | ||
− | |} | + | |}--> |
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Compliance Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
==References== | ==References== | ||
− | + | <references/> | |
− | |||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
+ | [[Category:Pennsylvania Wells]] | ||
+ | [[Category:FracFocus]] |
Well ID: 37-125-24303 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.466861,"lon":-80.351417,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Washington | |
Municipality: Robinson Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 147136 | |
Farm/Lease Name: ROBINHILL 21H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-10-19 | |
Well Type: GAS | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Conservation: Yes | |
Latitude: 40.466861 | |
Longitude: -80.351417 |
Date | Event |
---|---|
2010-10-19 | New Permit Application |
2010-12-14 | Performed Spud Operation |
2011-02-17 | Drilling Completion |
2011-04-11 | Perforation |
2011-04-11 | Performed Stimulation |
2012-03-27 | DEVIATED |
For data sources see[4]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2011-04-13 | 2011-04-13 | 5,840 | 3,611,396 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand | Proppant | 100.00 | 10.48 | ||||
Used to open perfs | ||||||||
Scale Inhibitor | ||||||||
Friction Reducer | Distillates, petroleum, hydrotreated light | 64742-47-8 | 30.00 | 0.02 | ||||
Water | Carrier/Base Fluid | 100.00 | 89.52 | |||||
Biocide | ||||||||
Water Viscosifier | Hydrochloric acid | 7647-01-0 | 32.00 | 1.31 | ||||
Carboxymethylhydroxyporoyl guar bln | 100.00 | 0.01 | ||||||
2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 30.00 | 0.00600000 | |||||
Polyethylene glycol | 25322-68-3 | 60.00 | 0.01 | |||||
Ethylene glycol | 107-21-1 | 30.00 | 0.00600000 | |||||
Dibromoacetonitrile | 3252-43-5 | 5.00 | 0.00100000 | |||||
Iron Control Agent |
For data sources see[5]
Stimulation Date | Phase Number | Chemical Agent | Volume (gal) | Treating Pressure (psi) | Breakdown Pressure (psi) |
---|---|---|---|---|---|
2011-04-11 | 0 | 0 | 0 |
For data sources see[6]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | ATLAS RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHEVRON APPALACHIA LLC | 43,316.00 | 17 | 0.00 | 0 | 724.73 | 17 |
2012 | CHEVRON APPALACHIA LLC | 519,389.00 | 366 | 0.00 | 0 | 1,572.25 | 366 |
2013 | CHEVRON APPALACHIA LLC | 296,612.00 | 365 | 0.00 | 0 | 446.16 | 365 |
2014 | CHEVRON APPALACHIA LLC | 345,234.00 | 365 | 114.51 | 184 | 1,229.70 | 365 |
2015 | CHEVRON APPALACHIA LLC | 217,390.00 | 281 | 331.58 | 130 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[7]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 4,305.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-007-24355 |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 1,035.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW001 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 100.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-007-24355 |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 85.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 78.00 Bbl | IDENTIFY METHOD IN COMMENTS | 34-167-29359 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 440.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,300.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 537.00 Bbl | INJECTION DISPOSAL WELL | 34-121-2-3995 |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 7,820.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 340.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | CHEVRON APPALACHIA LLC | Drilling Fluid Waste | 8,534.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | CHEVRON APPALACHIA LLC | Produced Fluid | 615.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 34-007-24355 |
2011 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste | 345.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2012 | CHEVRON APPALACHIA LLC | Produced Fluid | 5,365.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2013 | CHEVRON APPALACHIA LLC | Produced Fluid | 1,084.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2014 | CHEVRON APPALACHIA LLC | Produced Fluid | 2,370.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
2015 | CHEVRON APPALACHIA LLC | Produced Fluid | 895.00 Bbl | INJECTION DISPOSAL WELL | 34-121-23995 |
For data sources see[8]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1938168 | Primary Facility | 2010-12-16 | Drilling/Alteration | No Violations Noted | Randsom - Well spud, site still under construction , E&S in place on main pad, |
1944794 | Primary Facility | 2010-11-16 | Complaint Inspection | No Violations Noted | |
1951144 | Primary Facility | 2011-01-13 | Routine/Complete Inspection | No Violations Noted | On January 13th, 2011 I conducted an inspection of the above site. A portion of the fill side of the pad had sliped during construction. I met with Atlas representatives Gary Bowlen, Chad Eisenman, and Nick Staffieri on site. The fill side was still an estimated 14' below the proposed finished elevation. Multiple scarp faces were evident with a vetical separation of over 20' at the greatest. All material that moved stayed within the limit of disturbance. Some material had entered the interceptor channel at the base of the slope. No streams or watercourses are in close proximity to the base of the slope. The material that slid appeared dry and no springs or seeps were observed. The operator is to install additional E&S controls around the base of the slide and forward the reconstruction plan once designed. |
1953092 | Primary Facility | 2011-01-25 | Routine/Complete Inspection | No Violations Noted | On January 25th, 2011 I conducted a follow up inspection of the site in response to the slide and inspection on January 13th, 2011. Additioanl E&S controls were installed on the lower edge at the toe of the slip. During excavation and reconstruction the material began to move again. A scarp face of approximately 4' had developed. Constructed had halted until the engineers can evaluate the soil conditions and formualte a new plan for the excavation. |
1957864 | Primary Facility | 2011-02-04 | Routine/Complete Inspection | No Violations Noted | On February 4th, 2011 I conducted a follow up inspection of the site in response to the slide and inspection on January 13th and 25th, 2011. The lower side of the pad continues to slip during excavation. Construction efforts had been stopped. Temporary E&S controls put in place will remain in place until drilling is completed. After drilling is completed reclamation procedures are to start immediately, The rig was moving onsite today. A Site ID and E&S plan were posted onsite. The access road was in good condition. No spills/ leaks were observed at the time of inspection. |
1958492 | Primary Facility | 2011-02-09 | Routine/Complete Inspection | No Violations Noted | On February 9th, 2011 I conducted a follow up inspection of the site in response to the slide and inspections on January 13th and 25th, 2011. No new movement was observed. Construction efforts had been stopped. Temporary E&S controls put in place will remain in place until drilling is completed. After drilling is completed reclamation procedures are to start immediately. Drilling was started. A Site ID and E&S plan were posted onsite. The access road was in good condition. The pit appeared to be in good condition. No spills/ leaks were observed at the time of inspection. |
1961856 | Primary Facility | 2011-03-10 | Routine/Complete Inspection | No Violations Noted | On March 10th 2011 I conducted a routine inspection of the above site. Drilling was completed and the rig had moved offsite. The drill cuttings were being removed with an excavator and being hauled offsite. No additional movement was observed on the slide. The access road was in good condition. A site ID and E&S plan were posted on site. Excess runoff from the pad was beginning to crate a ditch and flow around the sediment trap. Some material upslope of the sediment trap had slid into the trap. Water flowing around the trap was undermining the filter sock and flowing into a wooded area approx 200¿. No streams or watercourses close. Crews were on site immediately to divert water into the sediment trap, a diversion was built at the top of the pad, and repairs and additions were made to the filter sock. |
1961858 | Primary Facility | 2011-03-11 | Routine/Complete Inspection | No Violations Noted | On March 11th 2011 I conducted a follow up inspection of the above site in response to the inspection on 3/10/2011. Straw bales had been added to the slope approaching the sediment trap to divert water into the trap. Straw bales had been added behind the filter sock below the sediment trap and repairs were made to the sediment trap. No more erosion was evident. All activities were within the limit of disturbance |
1992019 | Primary Facility | 2011-06-27 | Routine/Complete Inspection | No Violations Noted | On June 27th 2011 I conducted a routine inspection of the above site. Drilling was completed and production units were being installed. The pit was closed. The slide on the fill slope was not yet repaired awaiting restoration of the site. The access road was in good condition, Site ID and E&S plan were posted on site. No erosion was leaving site and was contained within the E&S controls. The operator should continue to monitor and inspection the E&S controls routinely and after each runoff event until site restoration is complete and permanent stabilization is established. |
2083597 | Primary Facility | 2012-07-12 | Routine/Complete Inspection | No Violations Noted | Looked at small slide on Robinhill #21. Small enough that they don't need a ESCPG-01. I will continue to monitor. |
2085188 | Primary Facility | 2012-07-20 | Routine/Complete Inspection | No Violations Noted | |
2094821 | Primary Facility | 2012-08-22 | Routine/Complete Inspection | No Violations Noted | On August 22, 2012, I stopped for a routine inspection at Chevron’s Robinhill #21; I met with Blake Loke, Matthew Barch and others. |
2163803 | Primary Facility | 2013-04-16 | Routine/Complete Inspection | No Violations Noted | |
2212401 | Primary Facility | 2013-10-09 | Routine/Complete Inspection | No Violations Noted | |
2300600 | Primary Facility | 2014-07-29 | Site Restoration | No Violations Noted | |
2353960 | Primary Facility | 2015-03-19 | Routine/Complete Inspection | No Violations Noted |
For data sources see[9]