X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-26935"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-125-26935
 
| Well ID: 37-125-26935
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.039469, -80.067258 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.039469, -80.067258 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Washington County, Pennsylvania|Washington]]
+
| Country: United States
 
|-
 
|-
| Municipality: [[West Bethlehem Township, Washington County, Pennsylvania|West Bethlehem Township]]
+
| State: Pennsylvania
 +
|-
 +
| County: [[Washington_County,_Pennsylvania|Washington]]
 +
|-
 +
| Municipality: [[West Bethlehem Township,_Washington_County,_Pennsylvania|West Bethlehem Township]]
 
|-
 
|-
 
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 
| Operator Name: [[CHEVRON APPALACHIA LLC]]
 
|-
 
|-
| Well Pad ID: [[144580|144580]]
+
| Well Pad ID: [[144580]]
 
|-
 
|-
 
| Farm/Lease Name: SARGENT UNIT 15H
 
| Farm/Lease Name: SARGENT UNIT 15H
 
|-
 
|-
| First Permit Date: 2013-01-16
+
| License Status: Regulatory Inactive Status
 
|-
 
|-
| Last Permit Date: 2013-01-16
+
| Spud Date: 08/07/2013
 
|-
 
|-
| Spud Date: 2013-08-07
+
| Permit Date: 1/16/2013
 
|-
 
|-
| Unconventional: Yes
+
| Unconventional Well: Y
 
|-
 
|-
| Horizontal: Yes
+
| Configuration: Horizontal Well
|-
 
| Well Status: ACTIVE
 
|-
 
| Violations: 0
 
 
|-
 
|-
 
| Latitude: 40.039469
 
| Latitude: 40.039469
 
|-
 
|-
 
| Longitude: -80.067258
 
| Longitude: -80.067258
|-
 
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Permits Issued Detail Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref><ref>{{cite web
 +
| title = Spud Data Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-04-30
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-16 }}</ref><ref>{{cite web
 +
| title = Oil and Gas Well Pad Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | GAS QUANTITY
+
!scope="col" | Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" | Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" | Gas Production Days
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" | Oil Quantity (bbl)
!scope="col" | OIL QUANTITY
+
!scope="col" | Oil Production Days
!scope="col" | OIL PRODUCTION DAYS
+
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2013-2
+
| 2013
| style="text-align:right;" | 0.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2014
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2014-1
+
| 2015
| style="text-align:right;" | 0.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 +
| 2016
 +
| [[CHEVRON APPALACHIA LLC]]
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2014-2
+
| 2017
| style="text-align:right;" | 0.0
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
|-
+
| 2019
| 2015-02
+
| [[CHEVRON APPALACHIA LLC]]
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0.00
| style="text-align:right;" | 0.0
+
| style="text-align: right;" | 0
|-
 
|-
 
| 2015-01
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
|-
 
|-
 
| 2015-03
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
| style="text-align:right;" | 0.0
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Production Report
+
  | title =Oil and Gas Production Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Production
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" | Period
!scope="col" | TYPE
+
!scope="col" | Waste Type
!scope="col" | QUANTITY
+
!scope="col" | Quantity
!scope="col" | UNITS
+
!scope="col" | Disposal Method
!scope="col" | DISPOSAL METHOD
+
!scope="col" | Waste Facility ID
!scope="col" | WASTE FACILITY PERMIT ID
 
!scope="col" | WASTE FACILITY NAME
 
!scope="col" | FACILITY CITY
 
!scope="col" | FACILITY STATE
 
 
|-
 
|-
 
| 2013-2
 
| 2013-2
| DRILL CUTTINGS
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 200.71
+
| style="text-align: right;" | 200.71 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
 
| 100172
 
| 100172
| ARDEN LANDFILL
 
| WASHINGTON
 
| PA
 
|-
 
 
|-
 
|-
 
| 2013-2
 
| 2013-2
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 1.0
+
| style="text-align: right;" | 1,307.00 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW001
 
| WMGR123SW001
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
|-
 
 
|-
 
|-
 
| 2013-2
 
| 2013-2
| FRACING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 550.0
+
| style="text-align: right;" | 550.00 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
|
 
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|
 
 
|  
 
|  
|-
 
 
|-
 
|-
 
| 2014-1
 
| 2014-1
| DRILL CUTTINGS
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 263.54
+
| style="text-align: right;" | 263.54 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
 
| 100172
 
| 100172
| ARDEN LANDFILL
 
| WASHINGTON
 
| PA
 
 
|-
 
|-
 +
| 2014-1
 +
| Drill Cuttings (in Tons)
 +
| style="text-align: right;" | 279.53 Tons
 +
| LANDFILL
 +
| 100592
 
|-
 
|-
 
| 2014-1
 
| 2014-1
| DRILL CUTTINGS
+
| Drill Cuttings (in Tons)
| style="text-align:right;" | 185.57
+
| style="text-align: right;" | 185.57 Tons
| Tons
 
 
| LANDFILL
 
| LANDFILL
 
| 100663
 
| 100663
| KELLEY RUN LANDFILL
 
| ELIZABETH
 
| PA
 
|-
 
 
|-
 
|-
 
| 2014-1
 
| 2014-1
| DRILL CUTTINGS
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 279.53
+
| style="text-align: right;" | 181.11 Bbl
| Tons
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| LANDFILL
+
| WMGR123SW001
| 100592
 
| SOUTH HILLS LANDFILL
 
| SOUTH HILLS
 
| PA
 
|-
 
 
|-
 
|-
 
| 2014-1
 
| 2014-1
| DRILLING FLUID WASTE
+
| Drilling Fluid Waste (in Barrels)
| style="text-align:right;" | 27.22
+
| style="text-align: right;" | 27.22 Bbl
| Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
| REUSE WITHOUT PROCESSING AT A PERMITTED FACILITY
 
|
 
|
 
 
|-
 
|-
 +
| 2014-1
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 11.11 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123SW001
 +
|-
 +
| 2014-2
 +
| Drill Cuttings (in Tons)
 +
| style="text-align: right;" | 101.90 Tons
 +
| LANDFILL
 +
| 100172
 +
|-
 +
| 2014-2
 +
| Drill Cuttings (in Tons)
 +
| style="text-align: right;" | 5.20 Tons
 +
| LANDFILL
 +
| 100663
 
|-
 
|-
| 2014-1
+
| 2015-1
| DRILLING FLUID WASTE
+
| Fracing Fluid Waste (in Barrels)
| style="text-align:right;" | 181.11
+
| style="text-align: right;" | 1,564.56 Bbl
| Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW001
 
| WMGR123SW001
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
 
|-
 
|-
 +
| 2015-1
 +
| Fracturing Fluid Waste (in Tons)
 +
| style="text-align: right;" | 31.33 Tons
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| 101532
 
|-
 
|-
| 2014-1
+
| 2015-1
| FRACING FLUID WASTE
+
| Produced Fluid (in Barrels)
| style="text-align:right;" | 11.11
+
| style="text-align: right;" | 74.44 Bbl
| Bbl
+
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2015-2
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 494.44 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW001
 
| WMGR123SW001
| RONCO WASTE PROCESSING FACILITY
 
| MASONTOWN
 
| PA
 
 
|-
 
|-
 +
| 2015-2
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 0.03 Bbl
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| 101532
 +
|-
 +
| 2015-2
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 5,158.33 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2015-2
 +
| Fracturing Fluid Waste (in Tons)
 +
| style="text-align: right;" | 0.60 Tons
 +
| STORAGE PENDING DISPOSAL OR REUSE
 +
| MID0209062814
 +
|-
 +
| 2015-2
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 5,549.44 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016-1
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 28.67 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123SW019
 +
|-
 +
| 2016-1
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 4,559.83 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| 2014-2
+
| 2016-2
| DRILL CUTTINGS
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align:right;" | 101.9
+
| style="text-align: right;" | 2,090.64 Bbl
| Tons
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| LANDFILL
+
| WMGR123SW019
| 100172
 
| ARDEN LANDFILL
 
| WASHINGTON
 
| PA
 
 
|-
 
|-
 +
| 2016-2
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 404.58 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| 2014-2
+
| 2016-2
| DRILL CUTTINGS
+
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
| style="text-align:right;" | 5.2
+
| style="text-align: right;" | 0.06 Tons
| Tons
+
| RESIDUAL WASTE TRANSFER FACILITY
| LANDFILL
+
| 101532
| 100663
 
| KELLEY RUN LANDFILL
 
| ELIZABETH
 
| PA
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Waste Report
+
  | title =Oil and Gas Waste Reports
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-03-31
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Waste
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-26 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" | Inspection ID
!scope="col" | DATE
+
!scope="col" | Inspection Category
!scope="col" | DESCRIPTION
+
!scope="col" | Inspection Date
!scope="col" | COMMENT
+
!scope="col" | Inspection Type
!scope="col" | VIOLATION ID
+
!scope="col" | Inspection Result
!scope="col" | VIOLATION CODE
+
!scope="col" | Inspection Comments
!scope="col" | VIOLATION_COMMENT
 
 
|-
 
|-
 
| 2182117
 
| 2182117
| 2013-07-02
+
| Primary Facility
 +
| 07/02/2013
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
 
|  
 
|  
|  
+
|-
|  
+
| 2204402
 +
| Primary Facility
 +
| 09/12/2013
 +
| Drilling/Alteration
 +
| No Violations Noted
 
|  
 
|  
 
|-
 
|-
 +
| 2265601
 +
| Primary Facility
 +
| 04/23/2014
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Patterson Rig 334
 
|-
 
|-
| 2204402
+
| 2267850
| 2013-09-12
+
| Primary Facility
 +
| 05/02/2014
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
|  
+
| Patterson Rig 334
|
 
|
 
|
 
 
|-
 
|-
 +
| 2269282
 +
| Primary Facility
 +
| 05/09/2014
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Patterson Rig 334
 
|-
 
|-
 
| 2343098
 
| 2343098
| 2015-02-08
+
| Primary Facility
 +
| 02/08/2015
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| On site to witness planned remedial 5 1/2 casing cementing job. Job delayed until Monday AM
+
| On site to witness planned remedial 5 1/2" casing cementing job. Job delayed until Monday AM, waiting on additional cement as part of contigency planning.  NOVIO
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2343104
 
| 2343104
| 2015-02-09
+
| Primary Facility
 +
| 02/09/2015
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| The remedial squeeze was performed on the Sargent 15H today. There were delays to ensure everything was in place for contingency plans in case of a failed cement job. Chevron did a very good job planning for the squeeze. The job went well. Circulation was achieved almost immediately and was maintained throughout the job. The gauged amount of returns equal the amount pumped indicating no lost circulation or significant fluid loss. A dye marker pumped at the beginning of the mud flush was returned at the calculated volume of returns indicating good circulation. Current plan is to WOC 24hrs
+
| The remedial squeeze was performed on the Sargent 15H today. There were delays to ensure everything was in place for contingency plans in case of a failed cement job. Chevron did a very good job planning for the squeeze.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2344395
 
| 2344395
| 2015-02-01
+
| Primary Facility
 +
| 02/01/2015
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| Check remdial work on 15H. Retrieved fish last night
+
| Check remdial work on 15H. Retrieved fish last night, ROH on coiled tbg, today run and retrieve swadge.  Tonight run sleeve and then mill top of sleeve.  Tomorrow AM anticipated PSI test.  Tomorrow PM anticipated start of stimulation on three adjacent wells.  Told WSM to give me 4 hours notice for frac job.  NOVIO
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2344958
 
| 2344958
| 2015-02-18
+
| Primary Facility
 +
| 02/18/2015
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| Setting casing patch. Problems setting top rubbers. Will set patch
+
| Setting casing patch. Problems setting top rubbers. Will set patch, mill top of  patch, PSI test and notify OGI 4 hrs in advance of anticipated stimulation.  NOVIO
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2344964
 
| 2344964
| 2015-02-19
+
| Primary Facility
 +
| 02/19/2015
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| Casing patch set. Milled off top of liner. PSI test to 9900 PSI succesful and documented. Rigging down coil tbg unit and moving off location. Anticipated stimulation this PM or early tomorrow AM. WSM notified to give DEP 4 hrs notice by phone before frac job. WSM notified that requirement for continuing with stimulation requires separate monitoring of the 15H annulus during stimulation and recording with all stimulations for permanent record and real-time data evaluation. NOVIO
+
| Casing patch set. Milled off top of liner. PSI test to 9900 PSI succesful and documented. Rigging down coil tbg unit and moving off location. Anticipated stimulation this PM or early tomorrow AM. WSM notified to give DEP 4 hrs notice by phone before frac job. WSM notified that requirement for continuing with stimulation requires separate monitoring of the 15H annulus during stimulation and recording with all stimulations for permanent record and real-time data evaluation. NOVIO
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2345604
 
| 2345604
| 2015-02-20
+
| Primary Facility
 +
| 02/20/2015
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| Chevron was able to stimulate the first zone in an adjacent well to the Sargent 15H this evening. There were no anomalies. There was no communication with the annulus on the 15H. The WSM's have made it clear to Schlumberger that if communication with the 15H is observed they should shut down immediately
+
| Chevron was able to stimulate the first zone in an adjacent well to the Sargent 15H this evening. There were no anomalies. There was no communication with the annulus on the 15H. The WSM's have made it clear to Schlumberger that if communication with the 15H is observed they should shut down immediately, in emergency mode, and await further instructions.  They have also made it clear that all fracs performed on the Sargent Pad will record real-time data of the 15H annulus.  NOVIO
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2345620
 
| 2345620
| 2015-02-21
+
| Primary Facility
 +
| 02/21/2015
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| During Frac operations of Sargent 9 -H ( 3 rd stage) there was failure of transducer on Sargent 15 - H . Pressure were from 0 -150 psi. Continue Frac operation with no issues. Chevron is removing transducer to verify no pressure on backside. Going to establish a back-side gauge to support monitoring. Spoke with WSM by phone and insisted that backside of 15H be loaded and have positive pressure to ensure annulus is showing instant response. Transducer failure is not acceptable. Chevron must have a standard analog gauge for back up and someone to monitor flow from 15H backside if needed.
+
| During Frac operations of Sargent 9 -H ( 3 rd stage) there was failure of transducer on Sargent 15 - H . Pressure were from 0 -150 psi. Continue Frac operation with no issues.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2346242
 
| 2346242
| 2015-02-23
+
| Primary Facility
 +
| 02/23/2015
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| Inspected manifolding for monitoring annulus of 15H. Having freezing issues may be affecting transducer readings. Updated monitoring to Schlumberger and Chevron on data display and data reporting. Ready to frac. NOVIO
+
| Inspected manifolding for monitoring annulus of 15H. Having freezing issues may be affecting transducer readings. Updated monitoring to Schlumberger and Chevron on data display and data reporting. Ready to frac. NOVIO
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2346243
 
| 2346243
| 2015-02-24
+
| Primary Facility
 +
| 02/24/2015
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| Still having difficulty with freezing in manifolding. Ready to frac. Asked for ASCII data on all stimulation jobs to date and anticipated frac schedule. NOVIO
+
| Still having difficulty with freezing in manifolding. Ready to frac. Asked for ASCII data on all stimulation jobs to date and anticipated frac schedule. NOVIO
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2347726
 
| 2347726
| 2015-02-26
+
| Primary Facility
 +
| 02/26/2015
 +
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| Currently stimulating 7H
+
| Currently stimulating 7H, 8H and 9H while monitoring annulus on 15H.  NOVIO
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 2352595
 
| 2352595
| 2015-03-18
+
| Primary Facility
 +
| 03/18/2015
 +
| Routine/Partial Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
|  
+
| § 78.86. Defective casing or cementing.
|  
+
|-
|  
+
| 2355737
|  
+
| Primary Facility
 +
| 03/27/2015
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| On Friday March 27th 2015, I inspected the Sargent site in response to an extension request and made the following observations:
 +
|-
 +
| 2356583
 +
| Primary Facility
 +
| 03/31/2015
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| All frac jobs completed on Sargent well site.  WSM indicated no communication with annulus of the 15H noted.  Special care taken  while monitoring annulus on 15H on the adjacent lateral sections.  Moving frac crew off  location by end of week.  NOVIO
 
|-
 
|-
 +
| 2441444
 +
| Primary Facility
 +
| 2016-01-19
 +
| Compliance Evaluation
 +
| No Violations Noted
 +
| This is an administrative CEI.
 +
As per Chevrons response and numerous on site inspections by the department, operator has provided the required plan for remediation, performed the remedial cement job and subsequent monitoring of the well during adjacent frac jobs show the well appears to be properly isolated with cement. 
 +
Further review after writing the initial violation shows that the operator did indeed notify the department and the violation for failure to notify of adefective cement job is incorrect and the violation for failure to notify is withdrawn.
 +
NOVIO
 
|-
 
|-
| 2355737
+
| 2476243
| 2015-03-27
+
| Primary Facility
 +
| 2016-03-24
 +
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
| On Friday March 27th 2015
+
| On 3/24/16 water samples were collected for SAC 946 and bacterial count analysis in response to a complaint regarding the Sargent site.
|
 
|
 
|
 
 
|-
 
|-
 +
| 2476333
 +
| Primary Facility
 +
| 2016-04-20
 +
| Administrative/File Review
 +
| No Violations Noted
 +
| On 4/20/16, I performed an administrative review of sample results and site observation for a complaint related to the Sargent site and made the following observations:
 +
•Water samples were found to have elevated hardness and iron levels; coliform and e. coli bacteria presence was also found indicating surface water influence.
 +
•Based on distance to nearest wells (~3000 and ~5000 feet away) and dates of most recent activity (4/19/15 and 9/4/10) as well as the above test results no oil & gas activity impact is indicated.
 
|-
 
|-
| 2356583
+
| 2593537
| 2015-03-31
+
| Primary Facility
 +
| 2017-05-15
 +
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| All frac jobs completed on Sargent well site. WSM indicated no communication with annulus of the 15H noted. Special care taken while monitoring annulus on 15H on the adjacent lateral sections. Moving frac crew off location by end of week. NOVIO
+
| On May 15, 2017, I conducted a routine-complete inspection of the Sargent Well Site located in West Bethlehem Township, Washington County.
|
+
 
|
+
The Act 9 sign was in place and clearly legible at the site entrance which is secured with a locked gate. The well pad is also secured with a separate chain-linked fence and lock.  The access road and the well pad are in good condition and the site is stabilized with vegetative growth.
|
+
 
 +
The secondary containment structure around the production tanks appears to be in good condition and functioning as intended. The gas wells appear to be in good working order and are labelled accordingly.
 +
 
 +
No violations were identified during the inspection.
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Oil and Gas Historical Inspection Report
+
  | title =Oil and Gas Compliance Report
| publisher = [[Pennsylvania Department of Environmental Protection]]
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| date = 2015-05-26
+
| date = 2019-05-20
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources#Inspections
+
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2015-05-27 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
<!--== Fracking Activities ==
{{reflist}}
+
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
 +
==References==
 +
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Pennsylvania Wells]]

Revision as of 13:05, 15 July 2019

Well Details

Well ID: 37-125-26935
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: West Bethlehem Township
Operator Name: CHEVRON APPALACHIA LLC
Well Pad ID: 144580
Farm/Lease Name: SARGENT UNIT 15H
License Status: Regulatory Inactive Status
Spud Date: 08/07/2013
Permit Date: 1/16/2013
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.039469
Longitude: -80.067258

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2013-2 Drill Cuttings (in Tons) 200.71 Tons LANDFILL 100172
2013-2 Drilling Fluid Waste (in Barrels) 1,307.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013-2 Fracing Fluid Waste (in Barrels) 550.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-1 Drill Cuttings (in Tons) 263.54 Tons LANDFILL 100172
2014-1 Drill Cuttings (in Tons) 279.53 Tons LANDFILL 100592
2014-1 Drill Cuttings (in Tons) 185.57 Tons LANDFILL 100663
2014-1 Drilling Fluid Waste (in Barrels) 181.11 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014-1 Drilling Fluid Waste (in Barrels) 27.22 Bbl REUSE OTHER THAN ROAD SPREADING
2014-1 Fracing Fluid Waste (in Barrels) 11.11 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014-2 Drill Cuttings (in Tons) 101.90 Tons LANDFILL 100172
2014-2 Drill Cuttings (in Tons) 5.20 Tons LANDFILL 100663
2015-1 Fracing Fluid Waste (in Barrels) 1,564.56 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-1 Fracturing Fluid Waste (in Tons) 31.33 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2015-1 Produced Fluid (in Barrels) 74.44 Bbl REUSE OTHER THAN ROAD SPREADING
2015-2 Fracing Fluid Waste (in Barrels) 494.44 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-2 Fracing Fluid Waste (in Barrels) 0.03 Bbl RESIDUAL WASTE TRANSFER FACILITY 101532
2015-2 Fracing Fluid Waste (in Barrels) 5,158.33 Bbl REUSE OTHER THAN ROAD SPREADING
2015-2 Fracturing Fluid Waste (in Tons) 0.60 Tons STORAGE PENDING DISPOSAL OR REUSE MID0209062814
2015-2 Produced Fluid (in Barrels) 5,549.44 Bbl REUSE OTHER THAN ROAD SPREADING
2016-1 Produced Fluid (in Barrels) RWC 802 28.67 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016-1 Produced Fluid (in Barrels) RWC 802 4,559.83 Bbl REUSE OTHER THAN ROAD SPREADING
2016-2 Produced Fluid (in Barrels) RWC 802 2,090.64 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016-2 Produced Fluid (in Barrels) RWC 802 404.58 Bbl REUSE OTHER THAN ROAD SPREADING
2016-2 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 0.06 Tons RESIDUAL WASTE TRANSFER FACILITY 101532

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2182117 Primary Facility 07/02/2013 Drilling/Alteration No Violations Noted
2204402 Primary Facility 09/12/2013 Drilling/Alteration No Violations Noted
2265601 Primary Facility 04/23/2014 Drilling/Alteration No Violations Noted Patterson Rig 334
2267850 Primary Facility 05/02/2014 Drilling/Alteration No Violations Noted Patterson Rig 334
2269282 Primary Facility 05/09/2014 Drilling/Alteration No Violations Noted Patterson Rig 334
2343098 Primary Facility 02/08/2015 Drilling/Alteration No Violations Noted On site to witness planned remedial 5 1/2" casing cementing job. Job delayed until Monday AM, waiting on additional cement as part of contigency planning. NOVIO
2343104 Primary Facility 02/09/2015 Drilling/Alteration No Violations Noted The remedial squeeze was performed on the Sargent 15H today. There were delays to ensure everything was in place for contingency plans in case of a failed cement job. Chevron did a very good job planning for the squeeze.
2344395 Primary Facility 02/01/2015 Drilling/Alteration No Violations Noted Check remdial work on 15H. Retrieved fish last night, ROH on coiled tbg, today run and retrieve swadge. Tonight run sleeve and then mill top of sleeve. Tomorrow AM anticipated PSI test. Tomorrow PM anticipated start of stimulation on three adjacent wells. Told WSM to give me 4 hours notice for frac job. NOVIO
2344958 Primary Facility 02/18/2015 Drilling/Alteration No Violations Noted Setting casing patch. Problems setting top rubbers. Will set patch, mill top of patch, PSI test and notify OGI 4 hrs in advance of anticipated stimulation. NOVIO
2344964 Primary Facility 02/19/2015 Drilling/Alteration No Violations Noted Casing patch set. Milled off top of liner. PSI test to 9900 PSI succesful and documented. Rigging down coil tbg unit and moving off location. Anticipated stimulation this PM or early tomorrow AM. WSM notified to give DEP 4 hrs notice by phone before frac job. WSM notified that requirement for continuing with stimulation requires separate monitoring of the 15H annulus during stimulation and recording with all stimulations for permanent record and real-time data evaluation. NOVIO
2345604 Primary Facility 02/20/2015 Drilling/Alteration No Violations Noted Chevron was able to stimulate the first zone in an adjacent well to the Sargent 15H this evening. There were no anomalies. There was no communication with the annulus on the 15H. The WSM's have made it clear to Schlumberger that if communication with the 15H is observed they should shut down immediately, in emergency mode, and await further instructions. They have also made it clear that all fracs performed on the Sargent Pad will record real-time data of the 15H annulus. NOVIO
2345620 Primary Facility 02/21/2015 Drilling/Alteration No Violations Noted During Frac operations of Sargent 9 -H ( 3 rd stage) there was failure of transducer on Sargent 15 - H . Pressure were from 0 -150 psi. Continue Frac operation with no issues.
2346242 Primary Facility 02/23/2015 Drilling/Alteration No Violations Noted Inspected manifolding for monitoring annulus of 15H. Having freezing issues may be affecting transducer readings. Updated monitoring to Schlumberger and Chevron on data display and data reporting. Ready to frac. NOVIO
2346243 Primary Facility 02/24/2015 Drilling/Alteration No Violations Noted Still having difficulty with freezing in manifolding. Ready to frac. Asked for ASCII data on all stimulation jobs to date and anticipated frac schedule. NOVIO
2347726 Primary Facility 02/26/2015 Drilling/Alteration No Violations Noted Currently stimulating 7H, 8H and 9H while monitoring annulus on 15H. NOVIO
2352595 Primary Facility 03/18/2015 Routine/Partial Inspection Violation(s) Noted § 78.86. Defective casing or cementing.
2355737 Primary Facility 03/27/2015 Routine/Complete Inspection No Violations Noted On Friday March 27th 2015, I inspected the Sargent site in response to an extension request and made the following observations:
2356583 Primary Facility 03/31/2015 Drilling/Alteration No Violations Noted All frac jobs completed on Sargent well site. WSM indicated no communication with annulus of the 15H noted. Special care taken while monitoring annulus on 15H on the adjacent lateral sections. Moving frac crew off location by end of week. NOVIO
2441444 Primary Facility 2016-01-19 Compliance Evaluation No Violations Noted This is an administrative CEI.

As per Chevrons response and numerous on site inspections by the department, operator has provided the required plan for remediation, performed the remedial cement job and subsequent monitoring of the well during adjacent frac jobs show the well appears to be properly isolated with cement. Further review after writing the initial violation shows that the operator did indeed notify the department and the violation for failure to notify of adefective cement job is incorrect and the violation for failure to notify is withdrawn. NOVIO

2476243 Primary Facility 2016-03-24 Complaint Inspection No Violations Noted On 3/24/16 water samples were collected for SAC 946 and bacterial count analysis in response to a complaint regarding the Sargent site.
2476333 Primary Facility 2016-04-20 Administrative/File Review No Violations Noted On 4/20/16, I performed an administrative review of sample results and site observation for a complaint related to the Sargent site and made the following observations:

•Water samples were found to have elevated hardness and iron levels; coliform and e. coli bacteria presence was also found indicating surface water influence. •Based on distance to nearest wells (~3000 and ~5000 feet away) and dates of most recent activity (4/19/15 and 9/4/10) as well as the above test results no oil & gas activity impact is indicated.

2593537 Primary Facility 2017-05-15 Routine/Complete Inspection No Violations Noted On May 15, 2017, I conducted a routine-complete inspection of the Sargent Well Site located in West Bethlehem Township, Washington County.

The Act 9 sign was in place and clearly legible at the site entrance which is secured with a locked gate. The well pad is also secured with a separate chain-linked fence and lock. The access road and the well pad are in good condition and the site is stabilized with vegetative growth.

The secondary containment structure around the production tanks appears to be in good condition and functioning as intended. The gas wells appear to be in good working order and are labelled accordingly.

No violations were identified during the inspection.

For data sources see[6]

References